Cases dismantling.
An overview of real construction sites where the project team supervised, documented and validated the dismantling. In 11 case studies, the dismantling was investigated together with students, each time testing and evaluating different tools, techniques and methods.
Dismantling an ETICS system with students
A facade with an ETICS system was dismantled together with four Industrial Engineering students and one Bachelor in Construction student.
Read case
Dismantling XPS from a ground floor
Dismantling insulation on a floor slab from social housing with Bachelor in Construction students.
Read case
From a pitched roof to a facade.
Rock wool insulation dismantled by students gets a second life in a facade.
Read case
Dismantling cellulose from a passive house
A passive house, completed in 2017, was unexpectedly expropriated. Instead of opting for demolition, it was decided to dismantle the house and fully rebuild it at the Verbeke Foundation in Kemzeke.
Read case
Glass wool for a garden outbuilding
From a pitched roof to insulation in an outbuilding.
Read case